Lead Time: Start Time: 07/09/07
End Time: 06/10/07
APQP: Not Required
Part Spec: PP
Mould Flow: Required
Tool: 4 imp hardened to 48-52 Rockwell C
3D Model: Not Required
Summary:

Not a particularly tricky tool but we included this in our studies because we completed this 4 imp construction part in 5 weeks including a tool drawing and product design.   It was required to finish off a housing project.  


The customer arrived to view sampling, they approved the part there and then, and then we ran the order off without a hitch.