Attention to detail at every stage

Tel: +44 (0)161 621 5000


To receive a copy of our newletter please sign up here. We promise not to pass on your details to a third party and you should expect to receive just one newsletter each month.


Home
>
About Us
>
Case Studies


Case Study 2

Lead Time: Start Time: 07/11/05
End Time: 20/01/06
APQP: Not Required
Part Spec: PVC
Mould Flow: Required
Tool: 1 + 1 Hardened to 48-52 Rockwell C
3D Model: Required
Summary:

This tool had to be produced with the moulder in mind. To prevent unnecessary gassing and in order to deal with the thin wall sections we had to incorporate up and down split lines on several levels. Otherwise the mould department would not have been impressed with the cycle time in order to release the part. Something you take for granted when you make your own tools.

Video:
Get the Flash Player to see this player.

ISO9001 Registered TS16949 Registered BRC Approved Project part-financed by the European Union. European regional developement fund.